Skip to content
Parkeray
  • Who we are
    • Our Philosophy
    • Lite
    • Interiors
    • Regions
    • Our Clients
    • Health & Safety
    • Sustainability
    • Diversity
    • Wellbeing
    • CSR
    • Charity
    • Quality
    • Financial
    • Supply Chain
    • Staff Development
  • Meet the team
  • Our Gallery
    • Videos
  • Blog
  • Working with us
    • Trainee Scheme
  • Contact Us
Back to project gallery

Grosvenor

Scroll down

Project
Holbein Gardens, 7 Holbein Place, London, SW1W 8NR

Client
Grosvenor

Project Team
BDG Architecture + Design, Dyntec Limited, TFT, HDR Inc, Storey Project, Mizu Consult

Value
£4.2m

Area
26,000 sq ft

Procurement Route
Single stage

Duration
22 weeks

Sector
Property

Work Type
Cat B

 

 

Grosvenor

CAT A to CAT B fit out

Parkeray have delivered a six-storey CAT A to CAT B fit-out at Holbein Gardens as part of the client’s serviced office offering. Early engagement on materials and finishes ensured sustainability requirements were met without compromising the intended aesthetic or programme.

Delivery highlights

  • 26,000 sq ft transformation of high-quality Cat B space
  • Expansion of level 1 spatial offering with a new mezzanine structure within the rejuvenated reception atrium
  • Extensive bespoke joinery to create a new event space and boardroom
  • Installation of welcoming kitchen services across each floor
  • Enhancement of basement shower and changing facilities to create a modern, well-equipped amenity space
  • Revitalisation of the roof terrace to provide an inviting outdoor breakout area

Key challenges & solutions

Sustainability was a paramount driver of the project, with stringent criteria set alongside a strong emphasis on design quality.

From the outset, we worked closely with the client and the wider stakeholder team to develop a fully coordinated design that balanced these requirements, ensuring sustainability standards were met without compromising the desired look and feel of the space. Early engagement across the design process enabled the delivery of a high-quality finish that precisely reflected the original marketing CGIs.

Project Team

  • Steve Mott
    Operations Director

  • Ryan Wager
    Project Director

  • Joseph Till
    Project Manager

  • Mark Swingler
    Project Manager

  • Razvan Filisan
    Project Manager

  • Jake Hook
    Assistant Project Manager

  • Robert Cafferty
    Services Director

  • Paul Hutchins
    Services Manager

  • Ryan Hignell
    Commercial Director

  • James Sturrock
    Commercial Manager

  • Steve La Roche
    Commercial Manager

  • Amelia Marshall
    Assistant Commercial Manager

  • Bruce Pounder
    Head of Design Management

  • Kristina Neveriova
    Design Manager

  • Beth Jepson
    Senior Sustainability Manager

  • Maciej Makara
    Logistics Manager

[contact-form-7 id="3817" title="Newsletter Subscription"]

Main contractor specialising in interior fit out and refurbishment

© 2018 PARKERAY / TERMS OF USE / PRIVACY POLICY / MODERN SLAVERY POLICY / SITEMAP

  • Social
  • Contact