We use cookies to help you navigate efficiently and perform certain functions. You will find detailed information about all cookies under each consent category below.
The cookies that are categorized as "Necessary" are stored on your browser as they are essential for enabling the basic functionalities of the site. ...
Necessary cookies are required to enable the basic features of this site, such as providing secure log-in or adjusting your consent preferences. These cookies do not store any personally identifiable data.
Functional cookies help perform certain functionalities like sharing the content of the website on social media platforms, collecting feedback, and other third-party features.
Analytical cookies are used to understand how visitors interact with the website. These cookies help provide information on metrics such as the number of visitors, bounce rate, traffic source, etc.
Performance cookies are used to understand and analyze the key performance indexes of the website which helps in delivering a better user experience for the visitors.
Advertisement cookies are used to provide visitors with customized advertisements based on the pages you visited previously and to analyze the effectiveness of the ad campaigns.
PROJECT
Power Road Studios, 114 Power Road, Chiswick
CLIENT
Helical
ARCHITECT
Barr Gazetas
VALUE
£2.7m
The Cat A installation from shell and core included the installation of two new lift shafts, new drainage to feed a toilet core over three floors and structural alterations to install a new pre-cast concrete staircase from ground floor level to the first floor. Transporting the two-part, 10 tonne precast concrete staircase into the building involved careful planning and logistics.
The WCs have been relocated and upgraded with new sanitary ware, accessories, tiled floors and splashback walls, new ceiling and finishes. The southern stair core is to be upgraded with a new floor, wall and ceiling finishes.
Externally we carried out a full refurbishment to the façade and also landscaped the surrounding area and rear courtyard. A new bespoke steel staircase was installed to open up the building into the rear courtyard, with a through reception formed to allow more efficient access from the front to the rear of the building. A new Scheuco glazed entrance foyer was installed to front of building, with green roof, automatic doorsets, stretched fabric ceiling and stone flooring with inset matwell.
Project Director
Andy Smith
Senior Project Manager
Dan Briggs
Assistant Project Manager
Ben Carpenter
Senior Commercial Manager
Brian Hemmings
Assistant Commercial Manager
Daniel Gibson
Services Manager
Frank Armstrong