Project
Holbein Gardens, 7 Holbein Place, London, SW1W 8NR
Client
Grosvenor
Project Team
BDG Architecture + Design, Dyntec Limited, TFT, HDR Inc, Storey Project, Mizu Consult
Value
£4.2m
Area
26,000 sq ft
Procurement Route
Single stage
Duration
22 weeks
Sector
Property
Work Type
Cat B
Parkeray have delivered a six-storey CAT A to CAT B fit-out at Holbein Gardens as part of the client’s serviced office offering. Early engagement on materials and finishes ensured sustainability requirements were met without compromising the intended aesthetic or programme.
Delivery highlights
Key challenges & solutions
Sustainability was a paramount driver of the project, with stringent criteria set alongside a strong emphasis on design quality.
From the outset, we worked closely with the client and the wider stakeholder team to develop a fully coordinated design that balanced these requirements, ensuring sustainability standards were met without compromising the desired look and feel of the space. Early engagement across the design process enabled the delivery of a high-quality finish that precisely reflected the original marketing CGIs.
Steve Mott
Operations Director
Ryan Wager
Project Director
Joseph Till
Project Manager
Mark Swingler
Project Manager
Razvan Filisan
Project Manager
Jake Hook
Assistant Project Manager
Robert Cafferty
Services Director
Paul Hutchins
Services Manager
Ryan Hignell
Commercial Director
James Sturrock
Commercial Manager
Steve La Roche
Commercial Manager
Amelia Marshall
Assistant Commercial Manager
Bruce Pounder
Head of Design Management
Kristina Neveriova
Design Manager
Beth Jepson
Senior Sustainability Manager
Maciej Makara
Logistics Manager