Skip to content
Parkeray
  • Who we are
    • Our Philosophy
    • Lite
    • Interiors
    • Regions
    • Our Clients
    • Health & Safety
    • Sustainability
    • Diversity
    • Wellbeing
    • CSR
    • Charity
    • Quality
    • Financial
    • Supply Chain
    • Staff Development
  • Meet the team
  • Our Gallery
    • Videos
  • Blog
  • Working with us
    • Trainee Scheme
  • Contact Us
Back to project gallery

Ipsos MORI

Scroll down

PROJECT
3 Thomas More Square, London

CLIENT
Ipsos MORI

ARCHITECT
Resonate Interiors Ltd

VALUE
£3.4 million

Ipsos MORI

This project involved updating the design and layout of 65,000 sq ft, levels 1 to 3, within a part-occupied building for leading market research company Ipsos MORI.

The existing mechanical and electrical services were re-arranged and supplemented with new equipment to suit. Bespoke joinery was fitted to the café and tea points and glazed partitions installed to provide an open plan work environment.

Level 4 was completely renewed to provide a stunning reception area and an array of meeting room suites for the client.

The project incorporated a variety of floor and wall finishes, joinery and feature ceilings to create a vibrant entrance and meeting room space. New structural steelwork was installed to support a number of sliding movable walls to provide maximum efficiency of space. The floors mechanical and electrical equipment was stripped back to the risers and renewed including a new VRV system and feature lighting.

The project was delivered to 18-week programme to coincide with the clients move-in date and consolidated their workforce into one building for the first time.

Project Team

  • Project Director
    Andy Smith

  • Project Manager
    Chris Dunne

  • Project Manager
    Dan Briggs

  • Services Director
    Ivan Collins

  • Senior Services Manager
    Rob Cafferty

  • Estimating Manager
    Pat Ennis

David Holliss 
CFO
Ipsos MORI

We were pleased with Parkeray’s approach to the refurbishment of our new offices – a complicated and dynamic project involving merging two existing sites into one. The work was finished to a high standard, on time and in budget. We now have a working environment we’re delighted to show our clients around, which meets our complex requirements and which inspires our staff.

[contact-form-7 id="3817" title="Newsletter Subscription"]

Main contractor specialising in interior fit out and refurbishment

© 2018 PARKERAY / TERMS OF USE / PRIVACY POLICY / MODERN SLAVERY POLICY / SITEMAP

  • Social
  • Contact