Skip to content
Parkeray
  • Who we are
    • Our Philosophy
    • Lite
    • Interiors
    • Regions
    • Our Clients
    • Health & Safety
    • Sustainability
    • Diversity
    • Wellbeing
    • CSR
    • Charity
    • Quality
    • Financial
    • Supply Chain
    • Staff Development
  • Meet the team
  • Our Gallery
    • Videos
  • Blog
  • Working with us
    • Trainee Scheme
  • Contact Us
Back to project gallery

Royal London Asset Management

Scroll down

PROJECT
200 Hammersmith Road, London

CLIENT
Royal London Asset Management

ARCHITECT
Ben Adams Architects

VALUE
Confidential

Royal London Asset Management

45,000 sq ft Cat A fit out of 3 floors completed on behalf of Royal London Asset Management.

Each of the 3 levels was fitted out to cat A standard including exposed services and new raised access floor ready for letting.  Our works also included the large roof terrace refurbishment. This included new bifold doors and double doors and timber decking with new planters, bar, canopy and handrail to the perimeter.

The new reception area included new entrance doors, reception desk, ceilings, micro screed floor, GRG ‘rope effect’ walls and blackened steel lift wall surrounds. A rope wall including structural steel supports to the ground floor atrium and new furniture to the atrium breakout space.

Project Team

  • Gerry Gilbert
    Project Director

  • Martin Wilson
    Project Manager

  • Brian Black
    Project Manager

  • Thomas Kruszewski
    Construction Manager Assistant

  • Greg Lloyd
    Senior Commercial Manager

  • Mark Raison
    Commercial Manager

  • Arron Knight
    Assistant Commercial Manager

  • Gary Richardson
    Senior Services Manager

  • Michael McCulloch
    Assistant Services Manager

[contact-form-7 id="3817" title="Newsletter Subscription"]

Main contractor specialising in interior fit out and refurbishment

© 2018 PARKERAY / TERMS OF USE / PRIVACY POLICY / MODERN SLAVERY POLICY / SITEMAP

  • Social
  • Contact